Protector’s Cut is a subterranean causeway excavated on July 24, 2026. Measuring approximately 48 blocks in length, the tunnel serves as a transit corridor connecting the central hub of Overgrove St. and Underrest Lodge to the newly surveyed western territories.

The project was commissioned by LACON to provide strategic access to new land offerings, thereby fostering regional economic growth.

The eastern entrance to the tunnel is located at coordinates (X: -482, Y: 69, Z: 324), and it terminates on the west side at (X: -530, Y: 69, Z: 324).